Flexible Manufacturing Field Trial
Ref: HURRAY-TR-A07004 Publication Date: 25, Apr, 2007
Flexible Manufacturing Field Trial
Ref: HURRAY-TR-A07004 Publication Date: 25, Apr, 2007Abstract:
Within the European project R-Fieldbus (http://www.hurray.isep.ipp.pt/activities/rfieldbus/), an industrial manufacturing field trial was developed. This field trial was conceived as a demonstration test bed for the technologies developed during the project.
Because the R-Fieldbus field trial included prototype hardware devices, the purpose of this equipment changed and since the conclusion of the project, several new technologies also emerged, therefore an update of the field trial was required.
This document describes an update of the manufacturing field trial. The purpose of this update, the changes and improvements introduced are described in the document. Additionally, this document also provides a reliable source of documentation for the equipment, configuration and software components of the manufacturing field trial.
Document:
Record Date: 25, Apr, 2007